The Municipality of North Grenville is requesting a quotation to complete the installation of 150.2m of new 200mm watermain on Sanders St and George St, the investigation of existing 150mm watermain and gate valves at four (4) other sites, and the removal and installation of three (3) 150mm gate valves in existing valve chambers. Based on previous watermain repairs and daylighting, existing watermains are at depths ranging from 1.8m – 2.1m, and new watermain will be installed with 2.1m of cover. The contractor will be responsible for the restoration of the sites to their previous condition upon completion of work, including landscaping.
A summary of the key dates are as follow:
Distribution of Tender August 31st, 2026
Contractor Clarification/Question Submission September 4th, 2026 12pm
NG Clarification/Answer Distribution September 8th, 2026,
Submission of Proposal September 10th, 2026 2pm
Anticipated Council Award September 22nd, 2026
For questions or to request a copy of the tender documents, please reach out to Nick Shepherd at